Metal roofing
Architectural shingles
Tile roofing
GAF
Owens Corning
Flat & low-slopeFree roof inspection with deck photos before we talk money - GAF and Owens Corning certified installation
Tamko Underlayment & Deck Repair: The Miami Owner’s Guide
If your Tamko roof is leaking, buckling, or showing soft spots, the problem usually isn’t the shingle you can see. It’s what’s underneath. We stock and install Tamko-compatible underlayment and decking repair materials across Miami, with most deck repairs running $850 to $2,400 depending on how much plywood has to come up. We carry the materials on our trucks, so for straightforward repairs we can usually handle the job in a single visit. Homeowners typically discover the failure after a heavy rain, when a ceiling stain shows up in a bedroom, or during a routine inspection when a roofer points out that the deck feels spongy underfoot.
Here’s what most people don’t realize: Miami’s humidity attacks underlayment long before the shingles show wear. When the underlayment fails, water sits against the decking, the plywood rots, and by the time you see a shingle lifting, you’re already into deck replacement territory. This page tells you exactly what to look for, what it costs to fix, and how to know whether your Tamko system can be saved.
Key Takeaways:
- Tamko underlayment failure in Miami is almost always moisture-driven, not age-driven
- Most deck repairs in Miami run $850 to $2,400 installed, depending on square footage and rafter condition
- We stock Tamko-compatible synthetic underlayment and CDX plywood on our trucks
- Mercer Roofing Co Miami is an independent roofing contractor; we are not affiliated with Tamko, but we install and repair their systems daily
- Every repair comes with a written price before we start and a 365-Day Done Right Promise in writing
Which Tamko Models This Applies To
Tamko’s underlayment line breaks into two families: their synthetic products (TW Underlayment, Apex, and MoistureGuard) and their felt-based products (Proline and 30# felt). The synthetic lines are what we see most often under Tamko’s Heritage, Elite Glass-Seal, and Titan XT shingle systems in Miami. If you’re unsure what’s under your shingles, the label is usually visible from the attic on the underside of the decking, or printed on the underlayment edge at the eave line. A Tamko TW Underlayment roll is 48 inches wide and comes in 250-square-foot rolls. MoistureGuard runs a different spec: 39.4 inches wide with a 200-square-foot coverage, which matters because the overlap pattern changes and so does the material math.
The OEM-vs-aftermarket question comes up a lot. For underlayment, an aftermarket synthetic from GAF, Owens Corning, or CertainTeed will perform as well as Tamko’s own, as long as the install follows Tamko’s nailing pattern and penetration details. The decking is where we push back on aftermarket hardware. Miami’s building code requires minimum 15/32-inch CDX plywood for reroof decking in most of Dade County, and cheap sheathing warps within two seasons here. We standardize on 1/2-inch CDX as a floor and upgrade to 5/8-inch when the rafter spacing exceeds 24 inches on center. That’s a spec detail most quotes gloss over, and it’s the difference between a deck that lasts twenty years and one that sags by the third hurricane season.
Styles & brands we work with






Signs Your Tamko Underlayment & Deck Repair Is Failing
- Stains on ceiling drywall or around can lights. This is water that has already passed through the shingles, through the underlayment, and is now pooling on the decking. By this point the underlayment is compromised in that spot, and the decking beneath it is almost certainly wet.
- Shingles that look “pillowed” or uneven from the ground. When the decking swells from moisture, it pushes the shingles up in soft waves. In Miami, this shows up most often on west-facing slopes where afternoon sun bakes wet plywood.
- Granule loss concentrated at the eaves, not just age-related wear. Tamko shingles shed granules naturally, but when underlayment fails at the eave line, water runs under the shingle and accelerates granule stripping from beneath.
- A soft or bouncy feel when walking the roof. Spongy decking means the plywood has delaminated. Your underlayment is already gone in that section, and the deck is structurally compromised. This is not a caulk-and-pray situation; it’s a cut-out-and-replace.
- Attic mustiness or visible water marks on rafter tails. Miami’s humidity hides underlayment failures for months. If the attic smells like wet cardboard after rain, the underlayment is wicking moisture even if you can’t see daylight through the decking yet.
Replacement Cost & What’s Included
Here’s the straight number set for Miami, because you should know what to expect before you pick up the phone.
- Underlayment only (partial replacement, 200-400 sq ft): $480 to $900 installed
- Underlayment full replacement (average Miami roof, 1,800-2,200 sq ft): $1,400 to $2,800 installed
- Deck repair (1-3 sheets of plywood replaced plus underlayment patch): $850 to $1,900 installed
- Deck replacement (10+ sheets, full section): $2,200 to $5,600 installed
What drives the range: how many sheets of plywood have to come up, whether the rafters themselves show rot (which adds sistering), roof pitch, and access. A two-story tile-topped roof in Coconut Grove costs more to work on than a one-story ranch in Westchester. Every quote includes tear-off of the failed material, haul-away, new fasteners, underlayment, decking, and the written 365-Day Done Right Promise. That promise means if the repair fails within a year, we return and make it right, free second visit included. No fine print, no re-quote.
Grant Whitlock, who runs our Miami crew, walks every deck inspection himself. He’ll give you a number in writing before any work starts, and that number doesn’t change unless you ask for additional scope. Call (850) 753-2996 and ask for a deck walk. The estimate is free.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
Let’s be honest about this part, because working on a roof in Miami is not the same as watching a tutorial filmed in Ohio. You can safely check a few things from the attic: look for water stains on the decking, feel for soft spots, and check whether your underlayment looks saturated or crumbly. That’s useful information for us.
What you should not do is pull shingles and try to patch underlayment yourself. This is steep-slope, fall-risk work, and if you miss a seam or nail through the wrong layer, you’ve created a leak where one didn’t exist. The decking itself is load-bearing: cutting into a rafter by mistake turns a $900 repair into a structural problem. We show up with harnesses, proper staging, and a crew that does this every week. If you want eyes on it first, call us. We’ll tell you honestly whether it’s a repair or a replacement, and you’ll have that in writing.
A roof shouldn’t be something you worry about – that’s our job.
FAQs
In Miami’s heat and humidity, synthetic underlayment typically lasts 12 to 18 years before it begins to degrade, and felt-based underlayment lasts much shorter, often 8 to 12 years. The deciding factor is usually how well the roof vents: a poorly vented Miami roof can cook underlayment from below and cut its life by a third. If your home is over 15 years old and still on original underlayment, we recommend a deck inspection. Call (850) 753-2996 and we’ll schedule one.
Yes, if the failure is localized. We cut back the shingles, remove the damaged underlayment, inspect the decking beneath, and install new synthetic underlayment with proper overlap before re-setting the shingles. If the damage runs under more than a third of a slope, or the decking shows widespread rot, the honest answer is usually a full reroof of that slope. We’ll show you photos from the roof so you can see exactly what we’re seeing before you approve anything.
Most deck repairs take one day. That includes tear-off, replacing the failed plywood, installing new underlayment, and re-installing shingles. If we’re opening up more than a few sheets or the rafters need sistering, it runs two to three days. We’ll give you a written timeline with the quote, and we stick to it.
We stock Tamko-compatible synthetic underlayment, Tamko shingles, and CDX plywood on our trucks and in our Miami yard. We also keep GAF, Owens Corning, and CertainTeed underlayment in stock for customers who prefer those brands. If you have a very specific Tamko product you want us to match, call (850) 753-2996 with the label info and we’ll confirm availability before we schedule the crew.
Get Your Free Deck Inspection in Miami
If water is getting under your Tamko shingles, waiting is the most expensive option. Rot doesn’t pause between hurricane seasons; it spreads under the decking and turns a patch job into a reroof. Call (850) 753-2996 to schedule your free estimate. You’ll get a written price before any work starts, a technician whose name and photo are sent to you before the visit, and a repair covered by our 365-Day Done Right Promise. That’s how we’ve done it across Miami since 2000, and it’s how we’ll do it for your roof.
Written by Grant Whitlock, Owner, Mercer Roofing Co Miami at Mercer Roofing Co Miami, serving Miami and nearby areas.